Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/mbctncx/www/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the redux-framework domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/mbctncx/www/wp-includes/functions.php on line 6114
Libya – M.B.C Tunis

Projet 3277 UNITS LYBIA

Execution of integrated facilities to collect 3277 units residential and Utilities Conference Dar Muammar Sabha

Project Value: 136 606 707 Libyan dinars  ( 108 000 000,00 USD )

Time of execution  : 22 month

the project Components of  :

Preliminary work

– Clean up the site 520000 m 2

– Acts of character 677000 m 3

Acts of sidewalks and edgings

– Edgings 520000 m. I

Network Communications

– Pipes 93000 m . I

Paving asphalt

– Asphalt pavement 480000 m ²

The work of the drinking water network

– Pipes of diameter 25 mm -315 mm 56,000 m. I

The work of the sewerage network

– Pipes of diameter 160 mm -650 cm 54000 m. I

– Manholes: 2520 Unit

Electrical work

– Electrical cables 350000 m . I

– Reducing the voltage stations equipped with 71 units – Lighting poles 3800 unit