Projet 3277 UNITS LYBIA
Execution of integrated facilities to collect 3277 units residential and Utilities Conference Dar Muammar Sabha
Project Value: 136 606 707 Libyan dinars ( 108 000 000,00 USD )
Time of execution : 22 month
the project Components of :
Preliminary work
– Clean up the site 520000 m 2
– Acts of character 677000 m 3
Acts of sidewalks and edgings
– Edgings 520000 m. I
Network Communications
– Pipes 93000 m . I
Paving asphalt
– Asphalt pavement 480000 m ²
The work of the drinking water network
– Pipes of diameter 25 mm -315 mm 56,000 m. I
The work of the sewerage network
– Pipes of diameter 160 mm -650 cm 54000 m. I
– Manholes: 2520 Unit
Electrical work
– Electrical cables 350000 m . I
– Reducing the voltage stations equipped with 71 units – Lighting poles 3800 unit