AGADEZ ROAD REHABILITATION WORK - TIGUIDIT 62 KM - NIGER
Total Amount Of The Contract 7,205,099,960 Fcfa
Exchange Rate: 655.957
Eur 10,984,104
Name Of The Contractor: Ministry Of Equipment Directorate General Of Major Works
Address: Agadez Regional Equipment Directorate
Description Of The Similarity: 62 Km Two-layer Road Surface, Hydraulic And Radius Structures, Fixing Of Dunes, Curbs, Water Descent, Horizontal And Vertical Signage, Safety Slide And Public Lighting.
Physical Size Of Works Or Nature Of Work Required:
Scarification: 499 380 M²
Foundation Layer: 63,504 M3
Base Layer: 88 634 M3
Binding Layer: 45,509 M²
Single-layer Coating: 183,060 M²
Double-layer Coating: 427 140 M²
Edges: 1,250 Ml
Gabion: 1,280 M3
Complexity: Sahelian Zone
Methods / Technology:
Earthworks Using Bulldozer And Loader,
Foundation Layer Form Implementation
And Basic By Graders, Compactor,
Coating Using Two Spreaders
Other Features:
Security Post Construction And Equipment
Other Measures On Impacts
Environmental And Social
Attaching The Dunes